Project info

Back to overview

Dewatering study farmhouse near OCMW Sint-Struiden

The city of Sint-Truiden requested AGT to analyse an existing dewatering design.  Piezometers were installed, levels measured and subsidence measurements were periodically executed.

Based on the known hydrogeological data, a groundwatermodel was designed and an alternative dewatering calculated, in which the costs of the installation and the impact on the environment was more restricted.